Skip to content

Monday, October 19, 2026

Mobile and Baldwin County News

Latest

Government Mobile

Mobile Civic Center Expo Hall to Be Demolished Before Regions Arena Opens, but Future of the Site Remains Undecided

Expo Hall, the last major Mobile Civic Center building still standing, will be torn down before Regions Arena opens next spring, but city officials say plans for the land have not yet been fully fleshed out.

A modern arena under construction beside an older exhibition hall awaiting demolition in downtown Mobile, Alabama
Expo Hall, the last of the three main Mobile Civic Center buildings, is set to be demolished before Regions Arena opens next spring.

MOBILE, Ala. — The last major piece of the old Mobile Civic Center complex will soon come down, but what will take its place is still an open question.

Expo Hall is the last of the three main buildings on the former Civic Center property still standing. City officials say it will be demolished before Regions Arena opens next spring, with grand-opening concerts scheduled for March 25–27. Beyond that, the future of the land Expo Hall occupies has not been decided. According to city officials, redevelopment plans for the site “have not yet been fully fleshed out.”

The end of an era for the Civic Center

For decades, the Mobile Civic Center was the city’s main venue for concerts, sporting events, conventions, Mardi Gras balls, graduations and trade shows. The complex included an arena, a theater and an exposition hall, and generations of Mobilians have memories tied to events held there.

The complex opened as the Mobile Municipal Auditorium on July 9, 1964, debuting with a “Holiday on Ice” show. Its domed arena could seat about 10,000 people for concerts and sporting events, its theater held roughly 1,940, and Expo Hall offered about 28,000 square feet of space, seating around 2,200 for seated events and up to 3,000 for concerts.

Over six decades, the building hosted a long list of famous performers, including Elvis Presley, Elton John, Prince, Journey, Led Zeppelin, The Rolling Stones and KISS. It was home to the Mobile Mysticks minor league hockey team and other professional franchises, and its concourse was a regular setting for Mardi Gras balls. High school graduations filled its seats each spring.

The Civic Center hosted its final performance on July 18, 2024, a dance recital by the Sheffield School of Dance, closing the book on a venue that many families had visited for generations.

The construction of Regions Arena changed that picture. The new arena is being built on the Civic Center property, and the older buildings have been coming down to make way for it. With Expo Hall’s demolition, the last of the three main Civic Center buildings will be gone.

Regions Arena opening next spring

The approximately $300 million Regions Arena project is scheduled to open in the spring of 2027. Grand-opening concerts are set for March 25–27, with The Red Clay Strays booked to christen the arena across three shows.

Other events are already on the arena’s calendar. Comedian Matt Mathews’ sold-out shows were moved to April 3 after construction delays, the Harlem Globetrotters are scheduled to stop in Mobile on April 24, 2027, and Def Leppard and the Goo Goo Dolls are bringing their 2027 tour to the arena on April 20.

The arena project includes more than the building itself. It provides for demolition of the remaining Civic Center buildings, along with street and utility improvements designed to accommodate additional development on the property.

The 2024 master plan for the 22-acre property

The city has previously presented a much broader vision for the 22-acre Civic Center property, one that pairs the arena with residential, commercial and entertainment development.

Under a master plan from March 2024, the property could accommodate:

  • 3.2 acres of residential development
  • 2.5 acres of mixed-use development
  • A 1.25-acre hotel site
  • 1.1 acres reserved for a potential theater

The plan also envisioned parking facilities and pedestrian connections tying the district together.

The mixed-use portion could bring together restaurants, retail shops, offices and other businesses. The idea is to create a district that stays active even on nights when the arena is dark, rather than a venue surrounded by empty parking lots that only come alive during events.

Concepts, not construction projects

It is important to note what the master plan does and does not do. The plan addresses the entire Civic Center property, not the Expo Hall footprint specifically. Its proposed developments were concepts, not approved construction projects designated for the land where Expo Hall now stands.

In other words, the master plan shows what could fit on the property as a whole, but it does not commit the city to building any particular project on the Expo Hall site.

Although the city has outlined several possibilities for the larger property, no final redevelopment proposal or construction schedule has been announced for the Expo Hall site.

A replacement theater remains a long-range idea

One question that comes up often is whether Mobile will get a new theater to replace the performing arts space that the Civic Center once provided.

A replacement theater remains part of the city’s long-range considerations, and the master plan reserves 1.1 acres for a potential theater. However, officials have acknowledged that financing such a facility alongside Regions Arena is not feasible right now. A Broadway-style theater could cost more than $100 million.

That price tag puts a new theater in a different category from the arena, which is already a major investment for the city. For now, the theater remains an idea for the future rather than a project with funding or a timeline.

Why the surrounding development matters

Arena projects in cities across the country have shown that the buildings around a venue can be just as important as the venue itself. Restaurants, hotels, apartments and shops near an arena give visitors places to go before and after events and give residents reasons to visit the area on other days.

The city has already taken steps to connect the arena to downtown activity. In September, an expansion of Mobile’s entertainment district to include the Regions Arena area was introduced at the City Council, drawing discussion about rules for to-go cups. The street and utility work included in the arena project is also intended to prepare the property for future development.

How the Expo Hall site is eventually used could shape the feel of the entire district. A hotel, housing or mixed-use project would add round-the-clock activity, while parking or open space would serve event crowds.

What happens next

For now, the timeline is clear on one point: Expo Hall is expected to be demolished before Regions Arena opens in late March. The rest depends on decisions the city has not yet made.

Here is where things stand:

  • Expo Hall: Last of the three main Civic Center buildings still standing; set for demolition before Regions Arena opens.
  • Regions Arena: About $300 million project; grand-opening concerts March 25–27, 2027.
  • Master plan: March 2024 concept for the 22-acre property includes residential, mixed-use, hotel and potential theater sites, plus parking and pedestrian connections.
  • Expo Hall site: No final redevelopment proposal or construction schedule announced.
  • Theater: Remains a long-range consideration; a Broadway-style venue could cost more than $100 million and is not feasible to finance alongside the arena.

As the arena’s opening approaches, residents and business owners will be watching to see whether the city moves the broader vision for the Civic Center property from concept to reality.

See something? Say something.

Got a news tip?

The best local stories start with readers. Tell our newsroom what is happening in your community.