Rising Costs Split the I-10 Mobile River Bridge and Bayway Into Two Phases
ALDOT will build the six-lane Mobile River Bridge first and re-stripe the existing Bayway in the meantime. Construction starts by the end of 2026, with toll rates set and the…
