Skip to content

Saturday, November 28, 2026

Mobile and Baldwin County News

Latest

Weather Brewton

Brewton Curfew Ordered as Isaias Leaves Escambia County Roads Blocked by Trees, Lines

Brewton’s 7 p.m. curfew remains in effect after Hurricane Isaias, and while about 95% of Escambia County roads are now passable, officials say roadside debris still makes travel hazardous.

Illustration of a fallen tree, snapped utility pole, and tangled power lines across a road in Escambia County, Alabama
Illustration: Fallen trees and downed power lines block a road in Brewton as a police vehicle stands guard during the curfew.

UPDATE, Oct. 15: Brewton’s curfew remains in place until further notice as more than 800 linemen from Georgia, Mississippi and across Alabama work until midnight to restore power. Mayor Frank Nalty Jr. said residents still in the dark could have electricity back by Thursday. The Escambia County EMA has issued debris guidance and warned pickup could take months in some areas, and school and college reopening dates are below.

Hurricane Isaias damage in Escambia County left roads blocked by fallen trees and power lines, a mobile home destroyed and much of Brewton without electricity. A Brewton curfew took effect at 7 p.m. Saturday, Oct. 10, as emergency crews worked to clear the debris.

Escambia County Sheriff Heath Jackson said the east side of the county took a serious amount of wind damage as Isaias moved inland after making landfall Friday night, Oct. 9, near Destin, Fla. Power lines, telephone poles and trees came down across roadways, cutting off travel in places and slowing the emergency response. Emergency officials reported no injuries during the early part of the storm.

Deputies blocked by fallen trees

Jackson described how severe conditions became during the storm. Two deputies were sent to a report of a vehicle that had run off the road and struck a water main, but downed trees blocking the road kept them from reaching the call. The deputies then needed help getting back to the sheriff’s office, Jackson said.

The sheriff also said one mobile home in the county was destroyed by wind. Emergency officials were unable to reach the home at first because Isaias’ winds were still too strong for crews to travel safely.

Manufactured and mobile homes are especially vulnerable in hurricanes, which is why the National Weather Service and emergency managers routinely advise people living in them to leave for a sturdier shelter before a storm arrives, even when they are well inland.

Brewton orders mandatory curfew

In Brewton, the county seat, the Brewton Police Department ordered a mandatory curfew beginning at 7 p.m. Saturday in response to what it described as a widespread power outage and extremely dangerous conditions.

The department said that as of that morning, most roadways and sidewalks were blocked by downed trees and power lines, and that after dark these obstructions would be barely visible, making conditions even more hazardous.

Police, fire and emergency medical crews were working to clear roads and remove safety hazards while trying to keep residents safe, and the department said the curfew would help them do that. Residents were urged to stay home while crews work to clear the hazards.

The curfew remained in effect into Sunday, Oct. 11, according to the police department. Residents should watch for announcements from the City of Brewton and the Brewton Police Department about when the order will be lifted.

Update, Oct. 13: Curfew extended; county roads passable but hazardous

Brewton’s curfew remains in effect from 7 p.m. to dawn until further notice. Mayor Frank Nalty said Tuesday it will stay in place until he is satisfied that the citizens of Brewton are safe, as hundreds of line workers replace broken poles across the city.

Outside the city, Escambia County Engineer Parker Ross said Monday afternoon that about 95% of county-maintained roads are now passable. But he cautioned that “passable” means emergency vehicles, disaster response teams and first responders can get through, not that the roads are back to normal.

Ross said there is still debris along the sides of the roads that needs to be cleared to provide safe travel.

County Commissioner Raymond Wiggins said crews are working to push debris back 3 to 5 feet from the edge of the pavement. Until then, the roads are considered passable but not fully open.

Wiggins said once that debris is removed, it will allow those who travel the roads to do so at the posted speed and in safety on each county road.

With hundreds of miles of county roads to clear, officials said the job will take time. Until it is finished, drivers are asked to:

  • Slow down and use extreme caution on county-maintained roads.
  • Expect debris along the shoulders and crews working near the road.
  • Give emergency vehicles, utility crews and disaster responders full access to the roadways.
  • Stay off the roads entirely when travel is not necessary.

The Escambia County Emergency Management Agency has already distributed tarps, water and other essentials and will announce times for additional distributions as they are scheduled. For the latest on power restoration, relief sites and cleanup help in Brewton and East Brewton, see our continuing coverage of the Brewton hurricane recovery.

Update, Oct. 15: 800-plus linemen, debris rules and school dates

The Brewton Police Department said Tuesday night, Oct. 13, that it continues to enforce the evening curfew because of widespread power outages and dangerous driving conditions left by Hurricane Isaias.

The department said utility crews are working hard to restore power and clear roads, asked for patience as they try to get things back to normal, and urged everyone to stay safe.

The police department said the curfew begins at 7 p.m. and remains in place until further notice. In a separate interview, Nalty described the curfew as running from 9 p.m. until dawn. Residents should check with the Brewton Police Department for the current hours and plan to be off the roads by the earlier time until the city clarifies.

Nalty said the curfew exists mainly to protect the line crews working late into the night. By his count, more than 800 linemen were in the city as of Tuesday night.

Nalty said that as of the previous night, over 800 linemen from Georgia, Mississippi, and all of Alabama were in Brewton, Alabama, working until midnight, and that the curfew gets people off the roads so it will be safe for the linemen.

The mayor said people who were still without power Wednesday could have it restored by Thursday, and he praised the way residents have responded.

Nalty said the community response has been excellent, with everyone staying at home, cleaning their yards, and coming together to help neighbors.

The city has received help from area agencies and utility companies throughout the restoration effort.

Debris guidance. The Escambia County Emergency Management Agency asked residents to follow these rules as they clean up:

  • Keep debris piles safely off the roadway and the shoulder.
  • Separate debris piles by type.
  • Residents on county roads may stockpile storm debris on the right-of-way.
  • Do not burn debris. The EMA advised against burning because of windy conditions.

The EMA said there is no timeline for debris pickup, and cleanup crews could take months to reach some areas.

Schools and college. Classes remain on hold across the area:

  • Coastal Alabama Community College, Brewton campus: Classes are canceled. Students should contact their instructors for further directions.
  • Brewton City Schools: Students return Wednesday, Oct. 21. The system was already scheduled to be out Oct. 19 and 20 for fall break.
  • Escambia County Schools: Students return Monday, Oct. 19. The system had already been scheduled to be out Oct. 12 and 13 for fall break.

Why the curfew matters

With streetlights and traffic signals out and trees and wires lying across streets and sidewalks, nighttime travel in a storm-damaged town is especially risky. A driver may not see a fallen limb or a sagging line until it is too late, and a downed wire can remain energized even when it appears dead. Keeping people off the roads after dark also leaves the way clear for emergency vehicles and work crews.

Curfews like Brewton’s are common in the hours after a hurricane, when public safety agencies need room to work and the risk of injuries from hidden hazards is highest.

Power slowly returning

Escambia County officials said communications and power were gradually coming back throughout the county. Still, the area was among the hardest hit in the state. Alabama Power spokesperson Beth Thomas said Saturday that in the hardest-hit areas, including Escambia and Monroe counties, restoration could take several days.

Alabama Power said more than 6,400 additional support personnel had joined its response, with crews working around the clock. Statewide, outages had topped 300,000 customers at the height of the storm, and about 172,646 customers remained without power as of 3 p.m. Saturday, according to outage-tracking data. Neighboring Conecuh County was almost entirely dark, with 99.5% of tracked customers out of service.

Utilities urged residents to treat every downed line as live and dangerous, to stay away from fallen trees and debris that could be hiding wires, and to report outages directly to their provider.

Jackson lifts its curfew

Elsewhere in southwest Alabama, conditions improved enough for one city to ease restrictions. In Jackson, in Clarke County, the curfew that had been in place was canceled Saturday for the rest of the weekend, according to the Jackson Police Department.

Safety tips for Escambia County residents

As cleanup continues and power remains out for many households, officials and utilities offered these reminders, in line with standard guidance from FEMA, the CDC and the Alabama Department of Public Health:

  • Follow the curfew. Stay home after 7 p.m. while the Brewton curfew remains in effect, and avoid unnecessary travel during the day. Line crews are working until midnight, so give them room on the roads.
  • Handle debris the right way. Keep piles off the roadway and shoulder, separate them by type and do not burn debris.
  • Stay away from downed lines. Assume every downed wire is energized, keep children and pets away, and report lines to your utility or 911.
  • Do not drive around barricades or through debris. Roads blocked by trees may also hide damaged lines or washed-out pavement.
  • Use generators safely. Run them outdoors only, far from doors, windows and vents, to prevent carbon monoxide poisoning. Never connect a generator directly to home wiring without a properly installed transfer switch.
  • Protect your food. Keep refrigerator and freezer doors closed. A closed refrigerator keeps food cold for about four hours, and a full freezer holds its temperature for about 48 hours.
  • Check on neighbors. Older residents and people who rely on electrical medical equipment may need extra help while the power is out.
  • Document damage. Photograph damage to homes, vehicles and property before cleanup for insurance purposes.

Looking ahead

Recovery in Escambia County is likely to take time, given the number of trees and power lines down on the east side of the county and the utility’s warning that restoration in the hardest-hit areas could take several days. Residents should follow updates from the Escambia County Sheriff’s Office, the Brewton Police Department, Escambia County emergency officials and their electric provider as roads are cleared and power returns.

Related coverage from South AL News

See something? Say something.

Got a news tip?

The best local stories start with readers. Tell our newsroom what is happening in your community.