Gulf Shores Opens New $137 Million High School After Nearly Six Years in the Making
Gulf Shores cut the ribbon on its new 287,000-square-foot, $137 million high school Monday, with classes starting Wednesday for up to 1,000 students.
GULF SHORES, Ala. — Gulf Shores City Schools officially unveiled its new high school Monday, with a ribbon-cutting ceremony at the Susan and Gayland McCollough Performing Arts and Sports Concourse that drew more than 700 attendees.
Students began classes at the new campus Wednesday. The project took nearly six years from initial concept to completion and carries a price tag that district officials have cited at roughly $137 million to $150 million.
The 287,000-square-foot campus can accommodate up to 2,000 students, with about 1,000 expected to enroll for the inaugural year — well above the roughly 900-student capacity of the old campus.
Gulf Shores City School Board President Kevin Corcoran said they finally have a facility that matches their mission.
Superintendent Matt Akin said the mission is to give nearly a thousand high schoolers not just an education but a direction, urging that they give students an opportunity by doing things differently and innovating.
Corcoran said the building was designed around an unusually wide range of specialized programs, listing aviation, zoology, oyster harvesting, scuba diving, hydroponics agriculture, and flying airplanes, among other offerings like culinary arts, robotics, performing arts, gaming and music, and hydroponic vegetable gardens supplying the cafeteria.
How the “forever school” came together
The idea for a new Gulf Shores High School traces back to 2015, when a group of parents and community members approached now-school board president Kevin Corcoran about splitting from Baldwin County Public Schools to launch the city’s own school district. Their philosophy from the start was academics first, facilities second.
The 200-acre site north of the Intracoastal Waterway, along the Foley Beach Express, came together through a land donation from Gulf Shores Mayor Robert Craft and his family, made before Craft became mayor. The city later purchased an adjoining 120 acres.
Craft said the family originally hoped the land would be used for either a school or a medical facility, thinking high school or hospital, and the evolution led to a high school first.
Craft said it takes years, commitment, and continuation from one elected group to the next, noting the school board that took office in 2008 — five election cycles ago — has stayed united behind the project, adding that it takes a long time and continuous passion.
Crews broke ground in April 2024, driving more than 1,800 pilings into the subsurface before construction could begin.
Two names appear on three of the new campus buildings: Dr. E. Gaylon McCollough, a local plastic surgeon and former All-American football player, and his wife, Susan, a lifelong artist and arts supporter, were honored with the naming of the Fine Arts Center, Health Professions Center and Performing Arts and Sports Concourse in recognition of their gift to the school.
McCollough said at the ribbon-cutting that he and Susan moved to Gulf Shores 27 years ago and quickly became aware of the educational, healthcare, creative and performing arts, and athletic potentials of the community, just waiting to transition from dreams to realities.
The senior class that just graduated from the old campus earned $61 million in scholarships — about $40 million more than the class before it, a jump school leaders point to as evidence the district’s academics-first approach is paying off.
Craft said they dreamed big, that it took a long time and a lot of money to get there, but they were fortunate to have opportunities to raise the money and will make a difference for everyone in the city.
Inside the new campus
The new school features 28 classrooms, 11 collaborative flex spaces, six science labs, a media center with a maker space and video production studio in place of a traditional library, and “The Sandbar,” a central gathering space in place of a traditional cafeteria. It also includes a 753-seat performing arts center, a covered outdoor practice field and a separate athletics and NJROTC wing.
Expanded space means the culinary and robotics programs, which had to turn students away last year, can now accept more of them. Local chef Jonathan Kastner teaches full-time in the school’s new kitchen, while other students are learning from Austral USA to help build U.S. Navy submarines, working toward scuba certification, or training on the navigation systems of a plane they built themselves.
Students who watched the building rise from the ground said the finished product exceeded their expectations.
Senior Addison Cosci said she is going to be the first one to graduate and thought that is so cool, adding she could never have imagined this and it is way beyond what she could have imagined.
A junior said the campus reflects the range of students it now serves, noting there are so many different types of students and so many different things that interest them, and praised how the school addresses each specialty.
Another student pointed to the open architectural design, saying everything is open and you can see everything about every classroom, while a third called the experience surreal, comparing it to something out of a movie or video game.
Sixth grader Liliana Sumerlin said she will be there in a couple of years and is very excited for that.
Corcoran said the school was built with long-term relevance in mind, with programs spanning from aviation to zoology, predicting the building will be relevant decades from now.
Doors open at 7:30 a.m. for students, and the district is offering public “Tuesday Tours” of the new campus on Aug. 11, 18 and 25.
About the district
Gulf Shores City Schools formally began operating in 2019, taking over the city’s schools from Baldwin County Public Schools after an agreement between the city and the county system. It was the first city district to separate from the Baldwin County system; Orange Beach followed with its own district in 2022.
Related coverage from South AL News
- Ribbon-Cutting Set for New Gulf Shores High School Ahead of Inaugural School Year
- New $157 Million Gulf Shores High School Opens Its Doors
- Two Gulf Shores City Schools Teachers Named Among 16 Alabama Teacher of the Year Finalists
- New 'Speak Up' App Lets Mobile County Students Report Safety Concerns Anonymously
