Orange Beach Moves to Award a $1.3 Million Burn Tower for Its New Fire Training and Surf Rescue Center
The Orange Beach City Council takes up a $1.3 million burn tower contract for a new facility behind Fire Station No. 1 that will house fire training, surf rescue operations, and badly needed office space.
Orange Beach is preparing to take the next step on a public safety project that has been quietly taking shape behind Fire Station No. 1 at the city hall complex. The city council is considering a bid for a training tower, the centerpiece of a new facility that will serve both the fire department’s training program and the city’s surf rescue operations.
The Burn Tower
Fire Chief Jeff Smith is recommending that the council award the bid for a burn tower and its installation to Roy Lewis Construction for $1.3 million. The remaining portion of the center is expected to cost roughly $1 million, bringing the overall investment to something in the neighborhood of $2.3 million. Buildings that make up the first phase of construction are already underway.
A burn tower is a purpose-built structure in which firefighters train under live fire conditions. Crews practice search patterns in heavy smoke, advance hose lines up interior stairs, perform ventilation, and rehearse rescues of downed colleagues, all in a controlled environment engineered to be set alight repeatedly. Without one, departments must either travel to a regional facility or simulate conditions that cannot really be simulated. Having a tower on site means training can happen on a normal shift rather than as a special expedition.
More Than a Training Building
Chief Smith has been clear that the name undersells the project. “While we are calling it a training facility, it will house both training and surf rescue,” he said when the bid for the buildings was awarded.
The facility is also a response to a space problem that has been building for years. “We have outgrown our administration building and currently have 13 employees with only eight offices,” Smith said. “Surf Rescue is housed with Coastal Resources, and both have outgrown that facility, too. So, this building will have office space for both divisions, which will allow more room for us in administration, as well as Coastal Resources.”
The finished center is expected to include:
- Office space for the surf rescue and coastal resources divisions
- Dedicated storage for surf rescue equipment
- A training room roughly twice the size of the current one
- A gym for staff at Fire Station No. 1
- Room for future growth within Station 1
For a beachfront city whose lifeguards are on the front line of one of the deadliest hazards on the Gulf Coast, consolidating surf rescue into a proper facility is not a minor housekeeping matter.
The Rest of a Long Agenda
The council took up the tower bid during a joint regular and work session, and the tower was far from the only item. Among the matters before the council in the regular session:
- Payment of approximately $1.2 million to vendors for goods and services
- A special events liquor license tied to the American Society of Civil Engineers 2026 summer meeting at the Orange Beach Event Center, July 29 through 31
- A longevity bonus for city retirees, authorized by the Legislature in its 2026 session at $12 per year of service. Funded with city money, the bonus would total an estimated $25,394 for all retirees; an employee with 25 years of service would receive $300. A similar proposal was voted down in 2022.
- Adoption of a revised personnel policy manual
- A laboratory services agreement with South Baldwin Regional Medical Center
- A $14,000 contract for leadership training for the police department
- A grant agreement with the National Audubon Society for stewardship of coastal Alabama beach-nesting bird habitat
- A $5,570 contract for geotechnical exploration and engineering services for a new building at the Aquatic Center
- Architectural and engineering services for a safe room for first responders
- A public hearing and first reading on perimeter landscaping for the Lost Bay Townhouses south of Canal Road
- A first reading of an ordinance reducing speed limits on certain streets in the Lauder Place Subdivision
Work Session Items
The work session agenda carried its own list of consequential items, including a $50,000 local match toward a $1 million grant from the Government Recovery Infrastructure Program to raise Jubilee Point Road, a chronic flooding concern; a $10,000 appropriation to the Baldwin County Child Advocacy Center; a resolution assigning Orange Beach police officers to the Baldwin County Drug Task Force; the purchase of two utility vehicles for the police department for $44,853 to replace units that have been in service nine years; taxi franchise requests; adoption of a city seal guide; a bid for a new work skiff for Coastal Resources; and the city’s participation in a lawsuit joined by other small governments over the alleged overpricing of fire department equipment and vehicles.
